Mawgan Porth
00, Great Western
Railway/Western Region, 6 by 1 foot
The imaginary Menalhyl Valley Branch would run from a junction west of Quintrel
Downs Platform, across Goss Moor, drop down into the valley, pass through St
Columb Major and terminating at
The aim of the railway was to develop the areas
farming, mining, and tourism helping by
Mawgan Porth seaside location. Despite the Porth there was no port though
historically coasters could dry out in the bay and load/unload.
Goods Inbound
milk/outbound through coach
Dairy Carriage
cleaning platform Goods Shed
Coal Bins
Panoramas of the layout
The through coach from the Cornish Riviera Express arrives
Its importance is shown by being hauled by a 56XX Class
The train is remarshalled
The break van and Fruit D (parcels van) will depart with the milk train
Milk tankers and wagons are move to the out bound train
The through coach is left by the
The milk departs
The auto (or push pull) train arrives
Stops at the platform
The local is made up of a pannier tank and a B Set of two coaches
The pannier tank has to run round the B Set
It has and it's off
The goods train arrived hauled by another pannier tank
The through coach is returned to the
The now empty milk wagons return
The train is remarshalled
The through coach back to London is ready to go.